Triple

T15159560
Position Surface form Disambiguated ID Type / Status
Subject Lomasney Way E362170 entity
Predicate near P350 FINISHED
Object Storrow Drive E136705 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Storrow Drive | Statement: [Lomasney Way, near, Storrow Drive]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Storrow Drive
Context triple: [Lomasney Way, near, Storrow Drive]
  • A. Storrow Drive chosen
    Storrow Drive is a major limited-access parkway running along the Charles River in Boston, known for carrying heavy commuter traffic and its low-clearance bridges that restrict large vehicles.
  • B. Woodhaven Road
    Woodhaven Road is a key multilane thoroughfare in Northeast Philadelphia that connects residential neighborhoods with major highways and commercial areas.
  • C. Greenbelt Road
    Greenbelt Road is a major thoroughfare in Greenbelt, Maryland, that serves as a key connector to local destinations including Greenbelt Park and surrounding communities.
  • D. Boughton Road
    Boughton Road is a major thoroughfare in Bolingbrook, Illinois, lined with commercial developments, shopping centers, and local amenities.
  • E. East McFetridge Drive
    East McFetridge Drive is a roadway in Chicago’s Museum Campus area that provides access to major lakefront attractions and facilities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a087b7c81908baa94a53dac8d68 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e0060dd71881908ecc4a4f52d438a5 completed April 15, 2026, 9:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69fee5e664b081909ef4b6a76976847f completed May 9, 2026, 7:44 a.m.
Created at: April 10, 2026, 3:08 a.m.