Triple
T15152773
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hamahiga Bridge |
E361990
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal bridge |
C4842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal bridge Context triple: [Hamahiga Bridge, instanceOf, coastal bridge]
-
A.
cross-sea bridge
chosen
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
B.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
C.
causeway-style bridge
A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
-
D.
dam bridge
A dam bridge is a structure that combines the functions of a dam for water retention and control with a bridge that provides a transportation route across the impounded water or river.
-
E.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0759908190b8a051d2e2a1cbe6 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:07 a.m.