Triple

T15092219
Position Surface form Disambiguated ID Type / Status
Subject Cumberland County, Maine E360446 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 295
Interstate 295 is a major auxiliary Interstate Highway in the northeastern United States that serves as a key bypass and connector route, including through parts of Maine.
E691574 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 295 | Statement: [Cumberland County, Maine, hasMajorHighway, Interstate 295]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 295
Triple: [Cumberland County, Maine, hasMajorHighway, Interstate 295]
Generated description
Interstate 295 is a major auxiliary Interstate Highway in the northeastern United States that serves as a key bypass and connector route, including through parts of Maine.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a035aa88190b52a139d3a1b7b6d completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e0027925788190b955fdc6626adf7d completed April 15, 2026, 9:26 p.m.
NED1 Entity disambiguation (via context triple) batch_6a118f6b6b8481908df3cb7d7ac8ca93 completed May 23, 2026, 11:28 a.m.
NEDg Description generation batch_6a119053e3b0819092c8e62b5b4ae02a completed May 23, 2026, 11:32 a.m.
NED2 Entity disambiguation (via description) batch_6a1190db5ab48190a5b902fee03abdde completed May 23, 2026, 11:34 a.m.
Created at: April 10, 2026, 3:04 a.m.