Triple
T14821115
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Airport & South Line |
E348452
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway line in Sydney |
C3787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway line in Sydney Context triple: [Airport & South Line, instanceOf, railway line in Sydney]
-
A.
railway line
chosen
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
B.
railroad line
A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
-
C.
urban rail loop line
An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
-
D.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
E.
rail route
A rail route is a defined path or corridor along which trains operate between specified locations, following a scheduled sequence of stops and track segments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822eb8f588190bf53445e730a934f |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:50 a.m.