Triple
T14776438
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sir Aston Webb |
E347273
|
entity |
| Predicate | notableWork |
P4
|
FINISHED |
| Object |
The Mall, London (remodelling and planning)
The Mall, London (remodelling and planning) refers to the early 20th-century redesign of the ceremonial route leading to Buckingham Palace, transforming it into a grand processional avenue and symbolic centerpiece of British state pageantry.
|
E1119173
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: The Mall, London (remodelling and planning) | Statement: [Sir Aston Webb, notableWork, The Mall, London (remodelling and planning)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: The Mall, London (remodelling and planning) Context triple: [Sir Aston Webb, notableWork, The Mall, London (remodelling and planning)]
-
A.
Charing Cross Station redevelopment, London
Charing Cross Station redevelopment, London is a major late-20th-century transformation of the historic central London railway terminus, featuring postmodern design elements and the landmark Embankment Place office complex above the tracks.
-
B.
London Plan
The London Plan is the Mayor of London’s strategic spatial development framework that guides long-term planning, growth, and land use across Greater London.
-
C.
Thames Gateway regeneration area
The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
-
D.
Hampstead Heath Extension
Hampstead Heath Extension is a large, semi-wild open space in north London known for its meadows, woodlands, and recreational areas adjoining the main Hampstead Heath.
-
E.
Carlton House Terrace development
Carlton House Terrace development is a prestigious 19th-century neoclassical terrace complex in central London, known for its grand townhouses overlooking The Mall and St James’s Park.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: The Mall, London (remodelling and planning) Triple: [Sir Aston Webb, notableWork, The Mall, London (remodelling and planning)]
Generated description
The Mall, London (remodelling and planning) refers to the early 20th-century redesign of the ceremonial route leading to Buckingham Palace, transforming it into a grand processional avenue and symbolic centerpiece of British state pageantry.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: The Mall, London (remodelling and planning) Target entity description: The Mall, London (remodelling and planning) refers to the early 20th-century redesign of the ceremonial route leading to Buckingham Palace, transforming it into a grand processional avenue and symbolic centerpiece of British state pageantry.
-
A.
Charing Cross Station redevelopment, London
Charing Cross Station redevelopment, London is a major late-20th-century transformation of the historic central London railway terminus, featuring postmodern design elements and the landmark Embankment Place office complex above the tracks.
-
B.
London Plan
The London Plan is the Mayor of London’s strategic spatial development framework that guides long-term planning, growth, and land use across Greater London.
-
C.
Thames Gateway regeneration area
The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
-
D.
Hampstead Heath Extension
Hampstead Heath Extension is a large, semi-wild open space in north London known for its meadows, woodlands, and recreational areas adjoining the main Hampstead Heath.
-
E.
Carlton House Terrace development
Carlton House Terrace development is a prestigious 19th-century neoclassical terrace complex in central London, known for its grand townhouses overlooking The Mall and St James’s Park.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822e9b9e08190bedcc31a163fda82 |
completed | April 9, 2026, 10:06 p.m. |
| NER | Named-entity recognition | batch_69dec817c39081909b08a0ffdfce9936 |
completed | April 14, 2026, 11:04 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fe0cff0474819092e8447f2f13cf59 |
completed | May 8, 2026, 4:19 p.m. |
| NEDg | Description generation | batch_69fe1cd4e298819099288c21852f3ae2 |
completed | May 8, 2026, 5:26 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69fe1d6a3360819081eeb43c2a4f84c3 |
completed | May 8, 2026, 5:29 p.m. |
Created at: April 10, 2026, 1:31 a.m.