Triple

T14741947
Position Surface form Disambiguated ID Type / Status
Subject Eureka Mountain Mine Ride E346369 entity
Predicate instanceOf P0 FINISHED
Object mine train roller coaster C4775 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mine train roller coaster
Context triple: [Eureka Mountain Mine Ride, instanceOf, mine train roller coaster]
  • A. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • B. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • C. steel roller coaster
    A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
  • D. roller coaster variant chosen
    A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
  • E. roller coaster concept
    A roller coaster concept is a high-level design blueprint that defines the ride’s theme, layout, key elements, and overall experience before detailed engineering and construction begin.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e6f1c88190bc494d491a907114 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:30 a.m.