Triple

T14693742
Position Surface form Disambiguated ID Type / Status
Subject Astute programme E345100 entity
Predicate instanceOf P0 FINISHED
Object submarine construction programme C27756 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: submarine construction programme
Context triple: [Astute programme, instanceOf, submarine construction programme]
  • A. naval shipbuilding program chosen
    A naval shipbuilding program is an organized, long-term initiative to design, construct, and deliver warships and support vessels to meet a navy’s strategic, operational, and technological requirements.
  • B. military submarine
    A military submarine is a stealth-capable naval vessel designed to operate underwater for extended periods to conduct surveillance, reconnaissance, and combat missions.
  • C. Victoria-class submarine
    The Victoria-class submarine is a class of diesel-electric, conventionally powered attack submarines operated by the Royal Canadian Navy, designed for stealthy coastal defense, surveillance, and anti-submarine warfare.
  • D. Vanguard-class submarine
    The Vanguard-class submarine is a class of British nuclear-powered ballistic missile submarines designed to provide the United Kingdom’s continuous at-sea nuclear deterrent.
  • E. manned submersible expedition program
    A manned submersible expedition program is an organized, multi-mission initiative that plans, operates, and supports crewed underwater vehicles to explore, study, and document the deep ocean environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e34b348190ada4d1cdb6c7c226 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:28 a.m.