Triple
T14386310
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Po Klong Garai towers |
E356731
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cham temple complex |
C25566
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cham temple complex Context triple: [Po Klong Garai towers, instanceOf, Cham temple complex]
-
A.
art of Champa
chosen
The art of Champa encompasses the sculptural, architectural, and decorative traditions of the ancient Cham civilization in central and southern Vietnam, characterized by intricate sandstone carvings, Hindu-Buddhist iconography, and distinctive brick temple-towers.
-
B.
Imambara
An Imambara is a Shia Muslim congregation hall or building used primarily for mourning ceremonies, religious gatherings, and commemorations, especially during Muharram.
-
C.
Tenman-gū shrine
A Tenman-gū shrine is a Shinto shrine dedicated to Sugawara no Michizane, revered as Tenjin, the kami of scholarship, learning, and the arts.
-
D.
royal palace complex
A royal palace complex is an expansive, architecturally unified ensemble of residences, ceremonial halls, administrative buildings, gardens, and supporting structures that together serve as the political, cultural, and domestic center of a monarchy.
-
E.
temple
A temple is a dedicated sacred structure or space where individuals or communities engage in worship, rituals, and spiritual practices associated with a particular religion or belief system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d827927c988190ad98bb0360981783 |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:16 a.m.