Triple

T14246962
Position Surface form Disambiguated ID Type / Status
Subject Armidale railway station E353159 entity
Predicate instanceOf P0 FINISHED
Object regional rail terminus C10600 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional rail terminus
Context triple: [Armidale railway station, instanceOf, regional rail terminus]
  • A. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • B. railway bridge terminus
    A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
  • C. terminal station chosen
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • D. narrow-gauge railway terminus
    A narrow-gauge railway terminus is the end station or final stopping point on a railway line that uses tracks of narrower width than the standard gauge, where trains begin or conclude their journeys and related operations are managed.
  • E. rapid transit station
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278c43e08190824146f4632b89a5 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:08 a.m.