Triple
T14111552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rome–Naples railway line |
E339649
|
entity |
| Predicate | parallelTo |
P1868
|
FINISHED |
| Object |
Rome–Naples high-speed railway
The Rome–Naples high-speed railway is a major Italian high-speed rail line that significantly reduces travel time between Rome and Naples as part of the country’s modern high-speed rail network.
|
E1082195
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rome–Naples high-speed railway | Statement: [Rome–Naples railway line, parallelTo, Rome–Naples high-speed railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Rome–Naples high-speed railway Context triple: [Rome–Naples railway line, parallelTo, Rome–Naples high-speed railway]
-
A.
Florence–Rome high-speed railway
The Florence–Rome high-speed railway is a major Italian high-speed rail corridor that connects Florence and Rome, significantly reducing travel times between central and northern Italy and the capital.
-
B.
Venice–Padua high-speed railway
The Venice–Padua high-speed railway is a planned Italian high-speed rail line intended to improve fast passenger connections between Venice and Padua as part of the country’s broader high-speed network.
-
C.
Rome–Fiumicino railway
The Rome–Fiumicino railway is a key rail link connecting central Rome with Leonardo da Vinci–Fiumicino Airport, providing frequent passenger services including the Leonardo Express.
-
D.
Mediterranean high-speed line
The Mediterranean high-speed line is a French high-speed railway corridor that extends the TGV network from the Rhône Valley toward the Mediterranean coast, significantly reducing travel times to cities like Marseille.
-
E.
Venice–Florence railway
The Venice–Florence railway is a major Italian rail line connecting the historic cities of Venice and Florence, serving as a key corridor for both high-speed and regional passenger services in northeastern and central Italy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Rome–Naples high-speed railway Triple: [Rome–Naples railway line, parallelTo, Rome–Naples high-speed railway]
Generated description
The Rome–Naples high-speed railway is a major Italian high-speed rail line that significantly reduces travel time between Rome and Naples as part of the country’s modern high-speed rail network.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Rome–Naples high-speed railway Target entity description: The Rome–Naples high-speed railway is a major Italian high-speed rail line that significantly reduces travel time between Rome and Naples as part of the country’s modern high-speed rail network.
-
A.
Florence–Rome high-speed railway
The Florence–Rome high-speed railway is a major Italian high-speed rail corridor that connects Florence and Rome, significantly reducing travel times between central and northern Italy and the capital.
-
B.
Venice–Padua high-speed railway
The Venice–Padua high-speed railway is a planned Italian high-speed rail line intended to improve fast passenger connections between Venice and Padua as part of the country’s broader high-speed network.
-
C.
Rome–Fiumicino railway
The Rome–Fiumicino railway is a key rail link connecting central Rome with Leonardo da Vinci–Fiumicino Airport, providing frequent passenger services including the Leonardo Express.
-
D.
Mediterranean high-speed line
The Mediterranean high-speed line is a French high-speed railway corridor that extends the TGV network from the Rhône Valley toward the Mediterranean coast, significantly reducing travel times to cities like Marseille.
-
E.
Venice–Florence railway
The Venice–Florence railway is a major Italian rail line connecting the historic cities of Venice and Florence, serving as a key corridor for both high-speed and regional passenger services in northeastern and central Italy.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c69b5c8819094aa1abf18302908 |
completed | April 9, 2026, 9:38 p.m. |
| NER | Named-entity recognition | batch_69de600e6a688190a1243a30ae9b7157 |
completed | April 14, 2026, 3:41 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fcdf04871c8190891605415f1abf7f |
completed | May 7, 2026, 6:50 p.m. |
| NEDg | Description generation | batch_69fce0cc78e881909090ac42a97ebb12 |
completed | May 7, 2026, 6:58 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69fce1f53a8881909fd1258729a9879d |
completed | May 7, 2026, 7:03 p.m. |
Created at: April 9, 2026, 10:22 p.m.