Triple

T14069041
Position Surface form Disambiguated ID Type / Status
Subject Plateau de Saclay fringe E338552 entity
Predicate instanceOf P0 FINISHED
Object peripheral zone C7693 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: peripheral zone
Context triple: [Plateau de Saclay fringe, instanceOf, peripheral zone]
  • A. transition zone chosen
    A transition zone is a boundary region where two distinct systems, phases, or environments meet and gradually change into one another, exhibiting mixed or intermediate characteristics.
  • B. protective zone
    A protective zone is a designated area or boundary established to shield people, assets, or environments from potential harm, hazards, or unauthorized influence.
  • C. orbital region
    The orbital region is the anatomical area of the skull that surrounds and contains the eye, including its bony socket and associated soft tissues.
  • D. autonomous area
    An autonomous area is a geographically defined region that possesses a degree of self-governance and decision-making authority independent from the central governing body.
  • E. international zone
    An international zone is a designated geographic area within or between countries that is governed by special international agreements, often granting it unique legal, economic, or diplomatic status distinct from surrounding national territories.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c67ba6c819091935650dfb3b895 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:21 p.m.