Triple

T13976171
Position Surface form Disambiguated ID Type / Status
Subject Shimla railway station E336192 entity
Predicate instanceOf P0 FINISHED
Object hill railway terminus C27832 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hill railway terminus
Context triple: [Shimla railway station, instanceOf, hill railway terminus]
  • A. railway bridge terminus
    A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
  • B. narrow-gauge railway terminus chosen
    A narrow-gauge railway terminus is the end station or final stopping point on a railway line that uses tracks of narrower width than the standard gauge, where trains begin or conclude their journeys and related operations are managed.
  • C. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • D. terminal station
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • E. Skyline station
    A Skyline station is an elevated or ground-level transit facility where passengers board, alight, and transfer between Skyline rail services and other transportation modes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c639e808190a0e4b4f3d31c6a59 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:18 p.m.