Triple

T13760312
Position Surface form Disambiguated ID Type / Status
Subject Main Building (Vassar College) E330588 entity
Predicate hasName P744 FINISHED
Object Main Building E330588 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Main Building | Statement: [Main Building (Vassar College), hasName, Main Building]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Main Building
Context triple: [Main Building (Vassar College), hasName, Main Building]
  • A. Main Building
    Main Building is the iconic historic centerpiece of Wells College’s campus, known for its distinctive architecture and central role in campus life.
  • B. Main Building
    Main Building is the central and most iconic structure of the University of Santo Tomas campus in Manila, Philippines, known for its historic architecture and academic significance.
  • C. Main Building
    The Main Building of the Tel Aviv Museum of Art is its principal exhibition complex, housing major collections of modern and contemporary art and serving as the museum’s central architectural landmark.
  • D. Main Building chosen
    Main Building is the iconic, historic central structure on Vassar College’s campus, known for its distinctive architecture and role as a focal point of college life.
  • E. Main Building
    The Main Building is the central conference and event facility within the World Conference Center Bonn complex in Bonn, Germany.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c573f288190aa2403d484fa3d49 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de0223ab9081909db05334860405e0 completed April 14, 2026, 9 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7a8606dbc8190b0f7c38583986141 completed May 3, 2026, 7:56 p.m.
Created at: April 9, 2026, 10:09 p.m.