Triple

T13505975
Position Surface form Disambiguated ID Type / Status
Subject Romney, Hythe and Dymchurch Railway E321015 entity
Predicate instanceOf P0 FINISHED
Object light railway C31730 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: light railway
Context triple: [Romney, Hythe and Dymchurch Railway, instanceOf, light railway]
  • A. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • B. light metro
    A light metro is a grade-separated, medium-capacity urban rail transit system that uses smaller trains and shorter headways than full-scale metros to efficiently serve moderate-demand corridors.
  • C. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • D. narrow-gauge railway line chosen
    A narrow-gauge railway line is a railroad whose track gauge is significantly smaller than the standard gauge, typically used in regions with difficult terrain, lower construction costs, or specialized transport needs.
  • E. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d807629d6c8190998f1b9bb12d2ed0 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:43 p.m.