Triple

T13266910
Position Surface form Disambiguated ID Type / Status
Subject Portable Life Support System E315946 entity
Predicate instanceOf P0 FINISHED
Object Apollo program equipment C22525 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Apollo program equipment
Context triple: [Portable Life Support System, instanceOf, Apollo program equipment]
  • A. Apollo Lunar Module
    The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
  • B. NASA ground support equipment
    NASA ground support equipment comprises the specialized tools, structures, and systems used on the ground to assemble, test, transport, service, and launch spacecraft and launch vehicles safely and reliably.
  • C. extravehicular activity equipment chosen
    Extravehicular activity equipment comprises the specialized suits, life-support systems, tools, and safety devices that enable astronauts to work safely and effectively outside a spacecraft in the vacuum of space.
  • D. Apollo lunar sample
    An Apollo lunar sample is a rock, soil, or core specimen collected from the Moon’s surface during NASA’s Apollo missions, used for scientific analysis of lunar geology and solar system history.
  • E. lunar orbiter mission
    A lunar orbiter mission is a spaceflight operation in which a spacecraft is placed into orbit around the Moon to conduct sustained observations, measurements, and communications for scientific, exploration, or operational objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b1d9ac8190852c5571d5bd5f0f completed April 9, 2026, 8:06 p.m.
Created at: April 9, 2026, 9:25 p.m.