Triple
T13103712
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Galloping Gertie |
E310786
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | collapsed bridge |
C14411
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: collapsed bridge Context triple: [Galloping Gertie, instanceOf, collapsed bridge]
-
A.
bridge collapse
chosen
A bridge collapse is the sudden structural failure of a bridge, causing partial or total loss of its load-bearing capacity and resulting in the deck or supporting elements falling or deforming beyond safe use.
-
B.
covered bridge
A covered bridge is a typically wooden, roofed structure that spans a waterway or gap, enclosing its roadway to protect the supporting framework from weather and extend its lifespan.
-
C.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
D.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
E.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806a872d08190a329806f8ff30df4 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:04 p.m.