Triple

T12551380
Position Surface form Disambiguated ID Type / Status
Subject HidroAysén E300103 entity
Predicate plannedInstalledCapacity P11312 FINISHED
Object approximately 2750 MW LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 2750 MW | Statement: [HidroAysén, plannedInstalledCapacity, approximately 2750 MW]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedInstalledCapacity
Context triple: [HidroAysén, plannedInstalledCapacity, approximately 2750 MW]
  • A. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • C. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • D. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • E. installedCapacity chosen
    Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada707008190aaec1238117c9379 completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d95f5507b481908d13cc317b7402f6 completed April 10, 2026, 8:36 p.m.
PD Predicate disambiguation batch_69d95410d0b0819097646edd1b837104 completed April 10, 2026, 7:48 p.m.
Created at: April 8, 2026, 9:58 p.m.