Triple

T12516128
Position Surface form Disambiguated ID Type / Status
Subject GNU Autotools E299195 entity
Predicate instanceOf P0 FINISHED
Object build automation toolchain C30694 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: build automation toolchain
Context triple: [GNU Autotools, instanceOf, build automation toolchain]
  • A. front-end build tool
    A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
  • B. build system generator chosen
    A build system generator is a tool that automatically produces platform-specific build configuration files (such as Makefiles or project files) from a higher-level project description.
  • C. software build and distribution system
    A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
  • D. task automation framework
    A task automation framework is a structured system of tools, components, and conventions that defines, schedules, and executes repetitive or complex tasks automatically based on configurable rules and workflows.
  • E. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada5cdd48190860d9ce30aff69be completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:57 p.m.