Triple
T12212125
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hot Creek Fish Hatchery |
E290989
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | aquaculture facility |
C31105
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: aquaculture facility Context triple: [Hot Creek Fish Hatchery, instanceOf, aquaculture facility]
-
A.
cultured fish
Cultured fish are aquatic animals raised under controlled conditions in managed environments such as ponds, tanks, or cages for purposes like food production, conservation, or research.
-
B.
public aquarium
A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
-
C.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
D.
fishing station
A fishing station is a designated facility or area where fish are landed, processed, stored, and often distributed, supporting commercial or local fishing activities.
-
E.
aquarium chain
An aquarium chain is a business organization that operates multiple retail or public aquarium locations under a unified brand, offering aquatic animals, supplies, and related services across different geographic areas.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab65923081909acfc61b7a612233 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:51 p.m.