Triple
T12123053
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | HRP |
E288740
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-level route |
C2519
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-level route Context triple: [HRP, instanceOf, high-level route]
-
A.
highway approach route
A highway approach route is a roadway segment or path that guides vehicles from local or arterial roads onto a highway, facilitating safe and efficient merging into higher-speed traffic.
-
B.
transportation route
chosen
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
C.
public transit route
A public transit route is a predefined path with designated stops and schedules along which public transportation vehicles (such as buses, trams, or trains) operate to move passengers between locations.
-
D.
road endpoint
A road endpoint is a location where a road segment terminates, either by connecting to another road, transitioning into a different type of pathway, or ending without continuation.
-
E.
highway direction
A highway direction represents the designated orientation or route of travel along a highway, typically indicated by cardinal or ordinal compass points (e.g., northbound, southeast).
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4b5e4c81909950b17151eb0951 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:49 p.m.