Triple

T11896622
Position Surface form Disambiguated ID Type / Status
Subject Fort Point (Galveston, planned/partial) E283049 entity
Predicate instanceOf P0 FINISHED
Object unfinished fort C30578 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: unfinished fort
Context triple: [Fort Point (Galveston, planned/partial), instanceOf, unfinished fort]
  • A. unfinished painting
    An unfinished painting is a work of visual art that remains incomplete, visibly lacking final details, sections, or refinement intended by the artist.
  • B. ruined fortress
    A ruined fortress is a once-formidable stronghold now fallen into decay, its crumbling walls and broken battlements bearing silent witness to past conflicts and lost civilizations.
  • C. masonry fort
    A masonry fort is a fortified structure built primarily from stone or brick, designed to provide durable defensive protection against attacks.
  • D. fortified building
    A fortified building is a heavily constructed structure designed with defensive features such as thick walls, limited entry points, and protective battlements to resist attacks and provide security for its occupants.
  • E. fortified quarter
    A fortified quarter is a heavily defended district within a settlement, protected by walls, towers, and controlled access points to safeguard key populations, resources, or institutions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2a90b08190a4e818821cc93e6d completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:44 p.m.