Triple
T11784791
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Broad Peak Central |
E280243
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | secondary summit |
C27831
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: secondary summit Context triple: [Broad Peak Central, instanceOf, secondary summit]
-
A.
subsidiary summit
chosen
A subsidiary summit is a secondary peak on a mountain that is distinct yet connected to the main summit, typically lower in elevation and often separated by a saddle or ridge.
-
B.
secondary peak
A secondary peak is a smaller, subordinate maximum in a distribution, signal, or function that occurs in addition to the primary (highest) peak.
-
C.
upland summit
An upland summit is the highest point or peak of an elevated land area, such as a hill or plateau, rising distinctly above the surrounding terrain.
-
D.
secondary campus
A secondary campus is a separate physical site or facility that extends the operations, services, or population of a primary institution, such as a school or college, while remaining administratively connected to it.
-
E.
secondary airport
A secondary airport is a smaller or less busy airport serving a metropolitan area or region, typically handling overflow, low-cost carriers, or regional traffic instead of being the primary hub.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab258b808190b1735835c841e3a4 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:42 p.m.