Triple

T11735632
Position Surface form Disambiguated ID Type / Status
Subject Ezhou Huahu Airport E279017 entity
Predicate instanceOf P0 FINISHED
Object cargo-focused airport C5261 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cargo-focused airport
Context triple: [Ezhou Huahu Airport, instanceOf, cargo-focused airport]
  • A. cargo airport chosen
    A cargo airport is a specialized aviation facility designed primarily for the handling, storage, and transportation of freight and mail, featuring extensive logistics infrastructure and limited or no passenger services.
  • B. Airport
    An airport is a complex transportation hub where aircraft take off, land, are serviced, and passengers and cargo transition between air and ground travel through various terminals and support facilities.
  • C. cargo airline
    A cargo airline is an air transport company that operates aircraft primarily for the carriage of freight and mail rather than passengers.
  • D. city airport
    A city airport is a transportation hub located within or near an urban area that facilitates the arrival, departure, and transfer of passengers and cargo via commercial and private aircraft.
  • E. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaffec6881908bead509e8621742 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:41 p.m.