Triple
T11551700
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nolin River Lake project |
E273910
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | recreation project |
C2577
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: recreation project Context triple: [Nolin River Lake project, instanceOf, recreation project]
-
A.
public works project
A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
-
B.
side project
A side project is a self-initiated, typically smaller-scale endeavor pursued alongside primary work or responsibilities to explore interests, develop skills, or test new ideas.
-
C.
recreation area
chosen
A recreation area is a designated space, either natural or built, intended for leisure, relaxation, and recreational activities such as sports, picnicking, and social gatherings.
-
D.
commemorative project
A commemorative project is an organized effort to honor, remember, or celebrate a person, group, event, or idea through lasting or symbolic actions, artifacts, or experiences.
-
E.
nonprofit project
A nonprofit project is a coordinated set of activities and resources organized to achieve a specific social, cultural, or environmental mission without the primary goal of generating profit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aae4dfa48190a3ab0b19a159a3c5 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:37 p.m.