Triple
T11384586
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hikari (on Sanyo Shinkansen section) |
E269683
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Shinkansen train service |
C75
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Shinkansen train service Context triple: [Hikari (on Sanyo Shinkansen section), instanceOf, Shinkansen train service]
-
A.
JR東日本の列車系統
JR東日本の列車系統は、東日本旅客鉄道(JR東日本)が運行する在来線・新幹線などの各路線上で設定された運転系統やサービス区分を指し、列車の運行区間・種別・系統番号などによって利用者にわかりやすく整理・案内するための概念である。
-
B.
mini-shinkansen line
A mini-shinkansen line is a converted narrow-gauge railway upgraded to standard gauge and high-speed standards, allowing Shinkansen trains to run directly onto conventional lines while maintaining through-service with the main high-speed network.
-
C.
passenger rail service
chosen
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
-
D.
high-speed rail service brand
A high-speed rail service brand is a distinct identity and marketing concept that represents a specific provider’s fast, long-distance passenger train services, encompassing its name, visual design, service standards, and customer experience.
-
E.
named train
A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aacdbc6c8190af6dc3d5f5d22836 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:34 p.m.