Triple

T11185349
Position Surface form Disambiguated ID Type / Status
Subject MP 43 E264651 entity
Predicate instanceOf P0 FINISHED
Object assault rifle prototype C3289 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: assault rifle prototype
Context triple: [MP 43, instanceOf, assault rifle prototype]
  • A. assault rifle chosen
    An assault rifle is a lightweight, shoulder-fired, magazine-fed firearm capable of selective fire and designed to use intermediate-power cartridges for effective combat at medium ranges.
  • B. recoilless rifle variant
    A recoilless rifle variant is a modified form of a recoilless gun designed to launch projectiles with minimal recoil, typically through specialized venting or counter-mass systems, for use in portable or vehicle-mounted anti-armor or support roles.
  • C. firearm
    A firearm is a portable weapon that uses confined explosive force to propel a projectile through a barrel toward a target.
  • D. dual-purpose gun
    A dual-purpose gun is a naval artillery weapon designed to effectively engage both surface and aerial targets using the same mount and fire-control system.
  • E. rifled gun
    A rifled gun is a firearm whose barrel has spiral grooves cut into its interior surface to impart spin to a projectile, improving its stability and accuracy in flight.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9dafac8190bd90d2c74f661aa7 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:29 p.m.