Triple

T11181262
Position Surface form Disambiguated ID Type / Status
Subject Parkway and civic center schemes in Philadelphia E264543 entity
Predicate instanceOf P0 FINISHED
Object city planning proposal C15908 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: city planning proposal
Context triple: [Parkway and civic center schemes in Philadelphia, instanceOf, city planning proposal]
  • A. town plan chosen
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • B. town planning policy
    Town planning policy is a set of rules and guidelines that shape how land is used and developed in a town to balance social, economic, and environmental needs.
  • C. city planner
    A city planner is a professional who designs, organizes, and regulates the use of urban space to balance social, economic, environmental, and infrastructural needs for sustainable community development.
  • D. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • E. planning district
    A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9dafac8190bd90d2c74f661aa7 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:29 p.m.