Triple
T11123857
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gaborone Dam |
E263084
|
entity |
| Predicate | isMajorWaterSupplyFor |
P4360
|
FINISHED |
| Object | Gaborone |
E48971
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gaborone | Statement: [Gaborone Dam, isMajorWaterSupplyFor, Gaborone]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Gaborone Context triple: [Gaborone Dam, isMajorWaterSupplyFor, Gaborone]
-
A.
Gaborone
chosen
Gaborone is the capital and largest city of Botswana, serving as its political and economic center.
-
B.
Maseru
Maseru is the largest city and administrative, economic, and cultural center of the Kingdom of Lesotho in southern Africa.
-
C.
Bulawayo
Bulawayo is Zimbabwe’s second-largest city and a major industrial, cultural, and transport hub in the southwestern part of the country.
-
D.
Tshwane
Tshwane is a major metropolitan area in South Africa that includes the country’s administrative capital, Pretoria, and serves as an important political and economic hub.
-
E.
Maputo
Maputo is the largest city and main economic and cultural center of Mozambique, located on the country’s southern coast along the Indian Ocean.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isMajorWaterSupplyFor Context triple: [Gaborone Dam, isMajorWaterSupplyFor, Gaborone]
-
A.
sourceOfWaterSupply
chosen
Indicates that one entity serves as the origin or provider of another entity’s water supply.
-
B.
waterSourceDedicatedTo
Indicates that a particular water source is specifically allocated or reserved for a designated use, group, or purpose.
-
C.
hasMajorReservoir
Indicates that an entity possesses or is associated with a primary or significant reservoir (such as a large storage or accumulation of a resource).
-
D.
waterSupplyShare
Indicates the proportion of a total water supply that is allocated to or used by a particular entity.
-
E.
isPartOfWaterSystem
Indicates that one entity is a component, segment, or subsystem within a larger water distribution, treatment, or management system.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9b46cc8190b19f9f0cc45bf322 |
completed | April 8, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69d7e82e933481908550499cf9dd6531 |
completed | April 9, 2026, 5:55 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ee861f89b48190b06fba51475497e6 |
completed | April 26, 2026, 9:39 p.m. |
| PD | Predicate disambiguation | batch_69d7441efe948190ae4ab020121e169d |
completed | April 9, 2026, 6:15 a.m. |
Created at: April 8, 2026, 9:28 p.m.