fullOperationDate

P53435
predicate

Indicates the date on which an operation or process is fully carried out or becomes completely effective.

All labels observed (5)

Label Occurrences
fullOperationDate canonical 2
fullOperationStart 2
firstFullOperationDate 1

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: fullOperationDate
Generated description
Indicates the date on which an operation or process is fully carried out or becomes completely effective.

Sample triples (7)

Subject Object
Very Large Array 1980
MOSE flood barrier system 2020 via predicate surface "firstFullOperationDate"
National Ignition Facility 2009 via predicate surface "fullOperationsStartDate"
Fugaku 2021 via predicate surface "fullOperationStart"
Fugaku 2021 via predicate surface "fullOperationStart"
African Standby Force
linked to: ASF
2010 via predicate surface "targetOperationalDate"
Line 2 2004