unit2Commissioned

P52113
predicate

Indicates that a second unit has been formally placed into active service or operation.

All labels observed (4)

Label Occurrences
unit2Commissioned canonical 2
additionalUnitCommissioned 1
commissionedUnit1 1

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: unit2Commissioned
Generated description
Indicates that a second unit has been formally placed into active service or operation.

Sample triples (5)

Subject Object
Calvert Cliffs Nuclear Power Plant 1977 ⓘ
Revelstoke Dam 2010 via predicate surface "additionalUnitCommissioned" ⓘ
Madras Atomic Power Station 1984 via predicate surface "commissionedUnit1" ⓘ
Madras Atomic Power Station 1986 via predicate surface "commissionedUnit2" ⓘ
Rivne Nuclear Power Plant 1981 ⓘ