constructionCost

P3154
predicate

Indicates the monetary or resource expenditure required to build or construct something.

All labels observed (10)

Label Occurrences
constructionCost canonical 306
hasConstructionCost 7
constructionCostUSD 4

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: constructionCost
Generated description
Indicates the monetary or resource expenditure required to build or construct something.

Sample triples (326)

Subject Object
USS Arizona (BB-39) approximately $16 million (1910s dollars) ⓘ
American Airlines Center approximately 420000000 USD ⓘ
FedExField US$250 million ⓘ
Large Hadron Collider about 4.6 billion Swiss francs via predicate surface "approximateCost" ⓘ
City of Manchester Stadium approximately £110 million ⓘ
Boston Garden $10,000,000 (approximate, 1928 dollars) ⓘ
Manchester Arena approximately £52 million ⓘ
Lumen Field approximately US$430 million ⓘ
Capitol Visitor Center approximately 621 million U.S. dollars ⓘ
Yankee Stadium $1.5 billion ⓘ
Yankee Stadium 1500000000 USD ⓘ
Parliament House, Canberra approximately A$1.1 billion ⓘ
Principality Stadium approximately £121 million ⓘ
MetLife Stadium 1600000000 USD ⓘ
Climate Pledge Arena over US$1 billion via predicate surface "constructionCostOfRenovation" ⓘ
Moda Center approximately US$262 million ⓘ
AT&T Stadium 1200000000 USD ⓘ
Stade de France approximately €285 million ⓘ
Titanic Belfast approximately £77 million ⓘ
Truist Park approximately US$622 million ⓘ
Staples Center approximately 375 million US dollars ⓘ
MCI Center approximately 260 million US dollars ⓘ
Lincoln Financial Field 512000000 USD ⓘ
Olympic Stadium (Montreal)
linked to: Olympic Stadium
cost significantly exceeded original budget ⓘ
Rogers Centre approximately CAD 570 million ⓘ
Citizens Bank Park $458 million ⓘ
loanDepot park approximately 634 million US dollars ⓘ
Sun Life Stadium approximately US$115 million ⓘ
Willis Avenue Bridge approximately 612000000 USD ⓘ
City Football Academy £200 million ⓘ
Kauffman Center for the Performing Arts about 413 million US dollars ⓘ
FedExForum 250000000 USD ⓘ
Walt Disney Concert Hall approximately 274 million US dollars ⓘ
ANZ Stadium A$690 million (approximate) ⓘ
FNB Stadium about 440 million US dollars (renovation) ⓘ
Shea Stadium approximately $28.5 million ⓘ
Veterans Stadium approximately $52 million ⓘ
Winspear Opera House $354000000 ⓘ
Stopera high and politically controversial ⓘ
Dignity Health Sports Park approximately 150 million US dollars ⓘ
Red Bull Arena approximately 200000000 USD ⓘ
Rod Laver Arena approximately A$94 million ⓘ
Marvel Stadium approximately A$460 million ⓘ
Citi Field approximately 850 million US dollars ⓘ
Gateway Arch approximately 13 million US dollars ⓘ
Shanghai International Circuit approximately 450 million USD via predicate surface "builtCost" ⓘ
Shanghai International Circuit approximately 2.6 billion CNY via predicate surface "builtCost" ⓘ
Yavuz Sultan Selim Bridge approximately US$3 billion ⓘ
Thames Barrier about £534 million (1982 prices) ⓘ
Eads Bridge about 10 million US dollars (19th century) ⓘ