Upper Snake River Project

E744814

The Upper Snake River Project is a U.S. Bureau of Reclamation water management and irrigation system in the upper Snake River Basin that includes multiple dams, reservoirs, and related infrastructure for flood control, power generation, and agricultural use.

All labels observed (2)

How this entity was disambiguated

Statements (46)

Predicate Object
instanceOf Bureau of Reclamation project ⓘ
water management project ⓘ
basin Columbia River Basin ⓘ
benefits agricultural production ⓘ
electricity supply ⓘ
flood risk reduction ⓘ
recreation ⓘ
country United States ⓘ
governingBody United States Department of the Interior ⓘ
hasPart American Falls Dam ⓘ
American Falls Reservoir ⓘ
Jackson Lake Dam ⓘ
Jackson Lake Reservoir ⓘ
linked to: Jackson Lake

Lake Walcott NERFINISHED ⓘ
Milner Dam ⓘ
Milner Reservoir ⓘ
Minidoka Dam ⓘ
Palisades Dam ⓘ
Palisades Reservoir ⓘ
diversion works ⓘ
hydroelectric powerplants ⓘ
irrigation canals ⓘ
infrastructureType canals ⓘ
dams ⓘ
powerplants ⓘ
reservoirs ⓘ
locatedIn Idaho ⓘ
Wyoming ⓘ
upper Snake River Basin ⓘ
linked to: Snake River Basin
managingAgency United States Bureau of Reclamation ⓘ
operator United States Bureau of Reclamation ⓘ
partOf federal reclamation program ⓘ
purpose flood control ⓘ
hydroelectric power generation ⓘ
irrigation ⓘ
municipal water supply ⓘ
water storage ⓘ
regionServed Upper Snake River Basin ⓘ
linked to: Snake River Basin

southern Idaho ⓘ
regulates Snake River streamflow ⓘ
river Snake River ⓘ
sector agriculture ⓘ
energy ⓘ
water resources management ⓘ
supports irrigated farming in southern Idaho ⓘ
waterSource Snake River ⓘ

How these facts were elicited

Referenced by (3)

Full triples — surface form annotated when it differs from this entity's canonical label.

Palisades Dam → partOf → Upper Snake River Project ⓘ
Island Park Reservoir → partOf → Upper Snake River irrigation system ⓘ
linked to: Upper Snake River Project
Palisades Reservoir → partOf → Upper Snake River Project ⓘ