Danube Flood Risk Management Plan

E387467

The Danube Flood Risk Management Plan is a coordinated international strategy that outlines measures to prevent, reduce, and manage flood risks across the Danube River Basin.

All labels observed (2)

How this entity was disambiguated

Statements (47)

Predicate Object
instanceOf flood risk management plan
river basin management document
abbreviation Danube FRMP
aimsTo improve coordination among Danube countries on flood risk management
reduce adverse consequences of floods for cultural heritage
reduce adverse consequences of floods for economic activities
reduce adverse consequences of floods for human health
reduce adverse consequences of floods for the environment
appliesTo Danube River Basin
linked to: Danube River basin
coversTerritory Danube River
linked to: Danube

Danube River Basin countries
linked to: Danube River basin
geographicFocus Central Europe
Eastern Europe
Southeastern Europe
hasGoal management of residual flood risks
prevention of flood risks
reduction of flood risks
hasScope flood preparedness
flood prevention
flood protection
flood recovery
flood response
includesMeasureType awareness-raising measures
early warning and forecasting measures
ecosystem-based flood risk reduction measures
emergency response measures
land-use planning measures
non-structural flood protection measures
structural flood protection measures
involvesStakeholderType civil protection authorities
environmental agencies
hydropower sector
national water authorities
navigation authorities
non-governmental organizations
spatial planning authorities
isBasedOn flood hazard maps
flood risk maps
isCoordinatedBy International Commission for the Protection of the Danube River
isPartOf Danube River Basin Management planning cycle
isRelatedTo Directive 2007/60/EC
EU Floods Directive
linked to: Floods Directive
language English
promotesApproach climate change adaptation in flood risk management
integrated river basin management
solidarity principle in flood risk management
timeHorizon multi-year planning period

How these facts were elicited

Referenced by (3)

Full triples — surface form annotated when it differs from this entity's canonical label.

ICPDR Plenary adopts Danube Flood Risk Management Plans
linked to: Danube Flood Risk Management Plan
Danube River Basin Management Plan relatedTo Danube Flood Risk Management Plan