Line 1

E271216

Line 1 is the first operational corridor of the Mumbai Monorail system, serving as a key elevated transit route in Mumbai, India.

All labels observed (1)

Label Occurrences
Line 1 canonical 1

How this entity was disambiguated

Statements (48)

Predicate Object
instanceOf monorail line ⓘ
rapid transit line ⓘ
alsoKnownAs Jacob Circle–Wadala–Chembur corridor ⓘ
character elevated ⓘ
cityServed Mumbai ⓘ
constructionStart 2009 ⓘ
country India ⓘ
electrification 750 V DC third rail ⓘ
elevation elevated ⓘ
endStation Jacob Circle ⓘ
fareSystem distance-based fare ⓘ
gauge monorail beam ⓘ
hasDepot Wadala Depot ⓘ
infrastructureType elevated guideway ⓘ
isPartOfPlan Mumbai Monorail master plan ⓘ
lineColor pink ⓘ
locatedIn India ⓘ
Maharashtra ⓘ
Mumbai ⓘ
numberOfStations 17 ⓘ
numberOfTracks 2 ⓘ
openingDatePhase1 2014-02-02 ⓘ
openingDatePhase2 2019-03-04 ⓘ
operator Mumbai Metropolitan Region Development Authority ⓘ
owner Mumbai Metropolitan Region Development Authority ⓘ
partOf Mumbai Monorail ⓘ
peakDirection Chembur to Jacob Circle ⓘ
phase1Section Wadala Depot–Chembur ⓘ
phase2Section Wadala Depot–Jacob Circle ⓘ
primaryFunction urban mass transit ⓘ
projectAuthority Mumbai Metropolitan Region Development Authority ⓘ
publicTransportSystem Mumbai public transport network ⓘ
region Mumbai Metropolitan Region ⓘ
safetySystem automatic train protection ⓘ
servesArea Chembur ⓘ
Jacob Circle ⓘ
Parel ⓘ
Wadala ⓘ
servesAs feeder to Mumbai Metro ⓘ
feeder to Mumbai Suburban Railway ⓘ
startStation Chembur ⓘ
status operational ⓘ
systemLengthKm approximately 19.5 ⓘ
technologySupplier Scomi Engineering ⓘ
ticketing paper ticket ⓘ
smart card ⓘ
transitType straddle-beam monorail ⓘ
transportMode rail-based ⓘ

How these facts were elicited

Referenced by (1)

Full triples — surface form annotated when it differs from this entity's canonical label.

Mumbai Monorail → lineName → Line 1 ⓘ